-
Poseidon2 3468
IP thermostat with 230V/16AIP unit for remote monitoring, web thermostat, industrial-telco version. Supports external RJ11 sensors.
Westwood Management
Total Data Center SolutionsThe additional space and equipment required to support data center operations — including power transformers, your uninterruptible power source (UPS), generators, computer room air conditioners (CRACs), remote transmission units (RTUs), chillers, air distribution systems, etc. In a high-density, Tier 3 class data center (i.e. a concurrently maintainable facility), this support infrastructure can consume 4-6 times more space than the white space and must be accounted for in data center planning.
-
Poseidon2 3268
Ethernet I/O control and sensor monitoring systemPoseidon2 3268 monitors sensors and controls I/O over a network. Logs data, alerts to high temperature.
Westwood Management
Total Data Center SolutionsThe additional space and equipment required to support data center operations — including power transformers, your uninterruptible power source (UPS), generators, computer room air conditioners (CRACs), remote transmission units (RTUs), chillers, air distribution systems, etc. In a high-density, Tier 3 class data center (i.e. a concurrently maintainable facility), this support infrastructure can consume 4-6 times more space than the white space and must be accounted for in data center planning.
-
Poseidon2 3266
Remote sensor monitoring over LANPoseidon2 3266 is a basic device for remote reading (monitoring) of sensors over the network.
Westwood Management
Total Data Center SolutionsThe additional space and equipment required to support data center operations — including power transformers, your uninterruptible power source (UPS), generators, computer room air conditioners (CRACs), remote transmission units (RTUs), chillers, air distribution systems, etc. In a high-density, Tier 3 class data center (i.e. a concurrently maintainable facility), this support infrastructure can consume 4-6 times more space than the white space and must be accounted for in data center planning.